This project delivered a completely new sewerage network to a previously underserved township, addressing years of strain on ageing infrastructure that had resulted in frequent blockages and overflows.
Working within a live, occupied environment, T Construction installed the new system in parallel with the existing network to ensure zero disruption to essential services throughout the 18-month construction period. Advanced CCTV inspection and fibre-optic scanning were used to accurately map both new and existing underground infrastructure across nearly 50% of the township's network.